Just Scraping By
The three options available are –Grinding – very this layers or resinPCD (scratching up) 1 – 4 mm resin or screed Scabbling – 2 – 8 mm resin, screed or asphaltScraping – lifting up with a blade. There are no fixed rules so the above are very rough guidelines only.The best solution will be dependent upon the consistency, make up and texture of the material that is down as well as its bonding to the base surface.In this article we’re...